Though reading the forum, I did not get it:

With TV-server there is now an updated Powerscheduler.

So there is an entry in the server and I am able to configure a "power scheduler client plugin" in MP client application.
So how are these two supposed to interact?!

To keep it simple, I have a one-seat-setup. So MP is on the same PC as the TV-Server.

Of course I do not want the client to suspend that machine is the Server has some scheduled recording.

And of course I do not want the TV-Server to suspend that PC if the MP client is playing my music.

Could someone please comment with some background infos?!

Thanks alot.
 

jcee

Portal Pro
November 23, 2004
282
1
Oh sorry.. hmm..
I did not find that one.. It obviously tells what I am looking for..

Thank you and sorry.
 