DoneThis is the logTake a look also at the line[code]2007-04-25 18.38.50.093750 [Debug][MPMain]: [MediaTranscoder.debug] Power scheduler ask next earliest wakeup time, it proposes 25/04/2007 18.38.50 and MT need 25/04/2007 8.00.00 [/code]It seems something wrong the date (I assume MT is MediaTranscoder). I think it should be "and MT need 26/04/2007 8.00.00". This is why, I think, scheduled jobs starts immediatly.Thank you very much!F.
Done
This is the log
Take a look also at the line
[code]
2007-04-25 18.38.50.093750 [Debug][MPMain]: [MediaTranscoder.debug] Power scheduler ask next earliest wakeup time, it proposes 25/04/2007 18.38.50 and MT need 25/04/2007 8.00.00 [/code]
It seems something wrong the date (I assume MT is MediaTranscoder). I think it should be "and MT need 26/04/2007 8.00.00". This is why, I think, scheduled jobs starts immediatly.
Thank you very much!