home
products
contribute
download
documentation
forum
Home
Forums
New posts
Search forums
What's new
New posts
All posts
Latest activity
Members
Registered members
Current visitors
Donate
Log in
Register
What's new
Search
Search
Search titles only
By:
New posts
Search forums
Search titles only
By:
Menu
Log in
Register
Navigation
Install the app
Install
More options
Contact us
Close Menu
Forums
Products
TV-Server
PowerScheduler++ test versions
Contact us
RSS
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Reply to thread
Message
<blockquote data-quote="michael_t" data-source="post: 714370" data-attributes="member: 85139"><p><strong>AW: Re: PowerScheduler++ Version 1.2.0.10 (RC1)</strong></p><p></p><p>[USER=69089]joseosoria[/USER]:</p><p>What I can see from your logs is that you ran the original PowerScheduler server plugin until 02.11. 15:29. At that time you restarted your tvservice with the PowerScheduler++ plugin, which worked without problems until 16:14, when you stopped tvservice (reboot?). When tvservice was restarted at 16:15 (PowerScheduler++ server plugin running) you made a sudden suspend within less than one minute so that tvservice could not come up properly. After a while at 16:31 and 16:44 you tried to run MP client which did not work maybe due to tvservice not running properly. But since the tvservice made no more logs after 16:15 I have no idea what was going on...</p><p>As a first step to improve system reliability you should reduce the PS++ check interval from 60 seconds to 15 seconds. Then you should watch if your system is running smoothly with PowerScheduler++ client and server plugins (scheduled wakeup, suspend after idle timeout, ...). And if this is all ok, you could check suspend and wakeup scenarios with blastcfg.exe.</p><p></p><p>Michael</p></blockquote><p></p>
[QUOTE="michael_t, post: 714370, member: 85139"] [b]AW: Re: PowerScheduler++ Version 1.2.0.10 (RC1)[/b] [USER=69089]joseosoria[/USER]: What I can see from your logs is that you ran the original PowerScheduler server plugin until 02.11. 15:29. At that time you restarted your tvservice with the PowerScheduler++ plugin, which worked without problems until 16:14, when you stopped tvservice (reboot?). When tvservice was restarted at 16:15 (PowerScheduler++ server plugin running) you made a sudden suspend within less than one minute so that tvservice could not come up properly. After a while at 16:31 and 16:44 you tried to run MP client which did not work maybe due to tvservice not running properly. But since the tvservice made no more logs after 16:15 I have no idea what was going on... As a first step to improve system reliability you should reduce the PS++ check interval from 60 seconds to 15 seconds. Then you should watch if your system is running smoothly with PowerScheduler++ client and server plugins (scheduled wakeup, suspend after idle timeout, ...). And if this is all ok, you could check suspend and wakeup scenarios with blastcfg.exe. Michael [/QUOTE]
Insert quotes…
Verification
Post reply
Forums
Products
TV-Server
PowerScheduler++ test versions
Contact us
RSS
Top
Bottom