- August 23, 2012
- 7
- 0
- 49
- Home Country
- Germany
MediaPortal Version: 1.2.3
Description
I have two tuners, only one is capable of descrambling Germand HD+. So I mapped the HD channels to one tuner and the SD version of the same channels to the other tuner.
Than I combined the HD- and SD-version of each channel using the TV-combinations-tab.
When I look at those combined channels using 'Edit channel'; from the TV Channel list, I can see that in some cases the HD-version is as position 1 and the SD-version is at position 2. That is what I desire.
But in other cases the SD-version is position 1 and the HD-version is position 2. When switching to one of those channels, Mediaportal show the SD-version. So I suspect MP tries to use the first entry that is given in the combination list for a channel. As a result MP switches to the SD-version while it could switch to the HD-version.
Unfortunately you can't change the order of the channels in the list in the 'Edit channel'- window. It looks as if you planned a simple drag&drop solution, but it doesn't work so far.
Or ss there an other way to change that order?
Steps to Reproduce:
1) Combine two channels.
2) Open the 'Edit channel' window in a channel list for the channel you combined
3) Try to change the order of the entries in the list.
Description
I have two tuners, only one is capable of descrambling Germand HD+. So I mapped the HD channels to one tuner and the SD version of the same channels to the other tuner.
Than I combined the HD- and SD-version of each channel using the TV-combinations-tab.
When I look at those combined channels using 'Edit channel'; from the TV Channel list, I can see that in some cases the HD-version is as position 1 and the SD-version is at position 2. That is what I desire.
But in other cases the SD-version is position 1 and the HD-version is position 2. When switching to one of those channels, Mediaportal show the SD-version. So I suspect MP tries to use the first entry that is given in the combination list for a channel. As a result MP switches to the SD-version while it could switch to the HD-version.
Unfortunately you can't change the order of the channels in the list in the 'Edit channel'- window. It looks as if you planned a simple drag&drop solution, but it doesn't work so far.
Or ss there an other way to change that order?
Steps to Reproduce:
1) Combine two channels.
2) Open the 'Edit channel' window in a channel list for the channel you combined
3) Try to change the order of the entries in the list.
Last edited: