If I have more than two schedules that are to start at the same time then only the first two are actioned, the remaining are ignored.
This has occured previously but I haven't had the logs at hand
The logs show that two schedules are actioned at 20.59, there should have been four at that time though.
SVN 16208 log attached
This has occured previously but I haven't had the logs at hand
The logs show that two schedules are actioned at 20.59, there should have been four at that time though.
SVN 16208 log attached