Change order of music views (1 Viewer)

jameson_uk

Retired Team Member
  • Premium Supporter
  • January 27, 2005
    7,257
    2,533
    Birmingham
    Home Country
    United Kingdom United Kingdom
    Other than hacking the xml or deleting and then re-adding views, is there a way to change to order of them that I have missed?:confused:
     

    Users who are viewing this thread

    Similar threads

    Hi. I was probably being a bit fast and loose with my terminology. I meant "somewhere within the files that MP2 uses in its database". Anyway, I found a way to do this which was far from automated but relatively low effort. I found what looked like all the images (CD covers, DVD covers, backgrounds etc all lumped together in...
    Hi. I was probably being a bit fast and loose with my terminology. I meant "somewhere within the files that MP2 uses in its...
    I am in the process of setting up a legacy media player (Mede8er) which I happened to have laying around into my home cinema setup...
    Replies
    2
    Views
    541
    Thankyou High_Five, that worked perfectly, I now remember doing that 10 years ago, thanks for jogging my old memory. Cheers Tony
    Thankyou High_Five, that worked perfectly, I now remember doing that 10 years ago, thanks for jogging my old memory. Cheers Tony
    Hi everyone, I have been using it For 16 years now (from V1.1.1) and it has worked flawlessly. I only use TV Series and Moving...
    Replies
    2
    Views
    543
    Sorry, I didn't get email notifications on these latest replies. I just came here to report I solved the problem after adjusting power settings for "Intel Graphics". I set it to Maximum Performance. I tried many other things so it could be a combination of them, but this was the last thing I did and I haven't had the problem return...
    Sorry, I didn't get email notifications on these latest replies. I just came here to report I solved the problem after adjusting...
    I'm running MP1 as a client only on this: https://www.amazon.com/dp/B0DZX5DWS5?ref_=pe_123509780_1038749300_t_fed_asin_title&th=1...
    Replies
    5
    Views
    2K
    I made some updates to the Wiki page describing the <import> and <include> tags, including adding a couple of new xml examples. For the first example, I highlighted the example text and eventually found the location in the menus where I could select the CODE macro to have the example text formatted as a code example. So far, so good...
    I made some updates to the Wiki page describing the <import> and <include> tags, including adding a couple of new xml examples. For...
    I made some updates to the Wiki page describing the <import> and <include> tags, including adding a couple of new xml examples. For...
    Replies
    0
    Views
    955
    Fixed, I think. Certainly the vintage MP2 installer that I was using no longer installs the LAV filters. I can only assume that these were never part of the install package itself, but rather downloaded during the install, and that link no longer exists. Shame that the installer doesn't indicate this. Last time when I installed the...
    Fixed, I think. Certainly the vintage MP2 installer that I was using no longer installs the LAV filters. I can only assume that...
    Hi all, I've recently retired my MP2 setup for my main HTPC and gone back to separates, but I wanted to retain the ability to play...
    Replies
    4
    Views
    689
    Top Bottom