How to change order of channels in EPG? (1 Viewer)

jonm

Portal Pro
January 12, 2009
429
26
Wales
Home Country
Wales Wales
I'm sure this is probably obvious, but I can't figure out how to change the order that channels appear in when I look at the TV guide. How is it done?

Thanks,

Jon.
 

Paranoid Delusion

Moderation Manager
  • Premium Supporter
  • June 13, 2005
    13,052
    2,978
    Cheshire
    Home Country
    United Kingdom United Kingdom
    This is done in TVServer config\channels\all channels, whatever order you arrange the channels too, will be reflected in the epg.
     

    Users who are viewing this thread

    Similar threads

    Got a reply from SD ... "Looks like your last successful download was on 5/23. On 5/24 for some reason we received 194 connections between 10:54 and 11:05 triggering a denial of service attack ban. The logs show it was lifted on 5/25, but I still see the entry in iptables. I reset fail2ban and hopefully you're working again." Weird...
    Got a reply from SD ... "Looks like your last successful download was on 5/23. On 5/24 for some reason we received 194...
    I'm using MediaPortal 1.38.1 x64 and have an SD-DD lineup account. In the last week, I have not been able to update my EPG, and...
    Replies
    3
    Views
    612
    Thankyou High_Five, that worked perfectly, I now remember doing that 10 years ago, thanks for jogging my old memory. Cheers Tony
    Thankyou High_Five, that worked perfectly, I now remember doing that 10 years ago, thanks for jogging my old memory. Cheers Tony
    Hi everyone, I have been using it For 16 years now (from V1.1.1) and it has worked flawlessly. I only use TV Series and Moving...
    Replies
    2
    Views
    543
    Sorry, I didn't get email notifications on these latest replies. I just came here to report I solved the problem after adjusting power settings for "Intel Graphics". I set it to Maximum Performance. I tried many other things so it could be a combination of them, but this was the last thing I did and I haven't had the problem return...
    Sorry, I didn't get email notifications on these latest replies. I just came here to report I solved the problem after adjusting...
    I'm running MP1 as a client only on this: https://www.amazon.com/dp/B0DZX5DWS5?ref_=pe_123509780_1038749300_t_fed_asin_title&th=1...
    Replies
    5
    Views
    2K
    I used to use the grabber but a few years back it disappeared on FreeSat DVBS. That is when I changed to EPG Collector. The extra benefit is that it collects from the Sky platform so it will give EPG for all the FreeSat channels plus the unencrypted movie channels on the Sky platform. It also allows me to pick the channels dedicated...
    I used to use the grabber but a few years back it disappeared on FreeSat DVBS. That is when I changed to EPG Collector. The extra...
    Hi everyone, I hope you are all well My Mum's Mediaportal lost it's marbles thanks to Microsoft update, (even though I had update...
    Replies
    2
    Views
    2K
    GitHub - jesmannstl/zap2xml: Automate TV guides to XMLTV much faster rewrite pulls full 14 day lineup in seconds. If pulling multiple lineups GitHub - jesmannstl/tvmerge: An updated and faster tvmerge utility merges 2 or more xmltv files. Both written in node.js.
    GitHub - jesmannstl/zap2xml: Automate TV guides to XMLTV much faster rewrite pulls full 14 day lineup in seconds. If pulling...
    Today I reached the end of my guide data. Upon researching what went wrong, I learned zap2it.com is dead. So zap2xml.exe doesn't...
    Replies
    13
    Views
    10K
    Top Bottom