Got a reply from SD ...
"Looks like your last successful download was on 5/23.
On 5/24 for some reason we received 194 connections between 10:54 and 11:05
triggering a denial of service attack ban. The logs show it was lifted on 5/25,
but I still see the entry in iptables. I reset fail2ban and hopefully you're
working again."
Weird...
Got a reply from SD ...
"Looks like your last successful download was on 5/23.
On 5/24 for some reason we received 194...
I'm using MediaPortal 1.38.1 x64 and have an SD-DD lineup account. In the last week, I have not been able to update my EPG, and...
Sorry, I didn't get email notifications on these latest replies. I just came here to report I solved the problem after adjusting power settings for "Intel Graphics". I set it to Maximum Performance. I tried many other things so it could be a combination of them, but this was the last thing I did and I haven't had the problem return...
Sorry, I didn't get email notifications on these latest replies. I just came here to report I solved the problem after adjusting...
I'm running MP1 as a client only on this:
https://www.amazon.com/dp/B0DZX5DWS5?ref_=pe_123509780_1038749300_t_fed_asin_title&th=1...
I used to use the grabber but a few years back it disappeared on FreeSat DVBS. That is when I changed to EPG Collector. The extra benefit is that it collects from the Sky platform so it will give EPG for all the FreeSat channels plus the unencrypted movie channels on the Sky platform. It also allows me to pick the channels dedicated...
I used to use the grabber but a few years back it disappeared on FreeSat DVBS. That is when I changed to EPG Collector. The extra...
Hi everyone, I hope you are all well
My Mum's Mediaportal lost it's marbles thanks to Microsoft update, (even though I had update...
GitHub - jesmannstl/zap2xml: Automate TV guides to XMLTV much faster rewrite pulls full 14 day lineup in seconds. If pulling multiple lineups GitHub - jesmannstl/tvmerge: An updated and faster tvmerge utility merges 2 or more xmltv files. Both written in node.js.
GitHub - jesmannstl/zap2xml: Automate TV guides to XMLTV much faster rewrite pulls full 14 day lineup in seconds. If pulling...
Today I reached the end of my guide data. Upon researching what went wrong, I learned zap2it.com is dead. So zap2xml.exe doesn't...