Hi.
By the way, I have changed back to the previous Weekly build as this one has too much more or less small issues. The last one is working better a lot, at least here on my system. As soon as I find the time I will generate a proper report with logs and screenshots showing the issues. Hope I can do this today evening, but not sure.
So I'm not the only one with this issue. For me it seems to be an issue of the workflow manager as in Logs it says screen sucessfully created but in GUI it isn't the case. And then MP2 client exe freezes with 50% CPU load (on my quad core i5)...Additionally I have since some month some problems, which are unfortunately not recorded in the log files.
When I press the power button in MP2, MP2 sometimes completely gets frozen. Even with Task Manager I need several attempts until the process can be stopped.
By the way, I have changed back to the previous Weekly build as this one has too much more or less small issues. The last one is working better a lot, at least here on my system. As soon as I find the time I will generate a proper report with logs and screenshots showing the issues. Hope I can do this today evening, but not sure.